Project Guides
Recommended project-level rollout patterns
Guides are not templates to copy blindly. They are reference architectures to reduce rollout mistakes and enforce consistent observability behavior across teams.
Available Guides
How To Use a Guide
- Match the guide to your deployment topology.
- Copy only the instrumentation and config patterns that fit your environment.
- Keep your internal naming and ownership model.
- Validate with production-like traffic before broad rollout.
Shared Rollout Policy
Stage 1: Controlled Start
- Enable telemetry in one environment (
stagingrecommended). - Validate auth + ingest + tags.
- Confirm no unacceptable overhead.
Stage 2: Expand by Tier
- Instrument critical services first.
- Add supporting services second.
- Add low-criticality services last.
Stage 3: Operational Hardening
- Key rotation policy documented.
- Sampling and retention policy defined.
- Runbooks for ingestion failures and noisy signals.
Minimum Guide Requirements
Every production-ready guide should define:
- Environment variable strategy.
- Service/version tagging model.
- Error capture baseline.
- Trace propagation assumptions.
- Deployment metadata strategy.
- Rollback and failure-mode guidance.
Anti-Patterns
- One global key for all environments.
- Inconsistent service naming across repos.
- Rollout without ingestion validation gates.
- Treating observability as an afterthought in CI/CD.
Success Metrics
Measure guide quality by outcomes:
- Faster triage in real incidents.
- Less time spent correlating data manually.
- Lower false-positive alert volume.
- Higher confidence in root-cause decisions.